img
ANRPC – Industrial Wastewater Treatment Plant
Client: Aquatech
Location: Egypt
Year: 2018
Scope: Electrical tasks such as installing, testing, and commissioning various components, including MCC panels, PLC panels, HMI systems, lighting systems, and instrumentation. This also includes loop checking, valve stroking, instrument calibration, and electrical equipment testing. Additionally, it covers mechanical activities such as fabricating piping, supports, steel structures, and painting. The project also includes equipment installation and testing, ensuring all systems are fully operational and calibrated as needed.
Top