Abu-Qir power plant (4 x 150MW)
Vibration expertise & analysis for the Four (4 x 150MW) Steam Turbines and their steam governing systems, following the turbines control’s upgrade conducted by Honeywell/GE.
EDF’s BOOT, Port-Said East Power plant (4 x 345MW)
Technical assistance contract for operation & maintenance of the plant DCS system supplied by ALSTOM Power (ALSPA-P320).
Duplex welding repair & Complete Overhauling of 8 x Circulating Water pumps.
Nubaria-3 CCPP (1 x 750MW)
Design, Supply, Fabrication and site erection of 1x920m³ capacity (in SS-304L) Demineralized Water Storage Tank, including its accessories.